Thu07242014

     Subscribe  |  Contact  |  Advertise  |  RSS Feed Other Publications

Wednesday, 22 November 2006 00:00

Slope development ordinance: Key changes

Written by 

Haywood County Commissioners made several changes to the slope development ordinance before passing it. The ordinance kicks in when a cut-and-fill slope exceeds a certain threshold. That threshold is what commissioners altered. Here’s the net effect of the changes:

• Proposed: A slope stabilization plan is required for any cut-and-fill slope taller than 10 feet.

• Change: This measure was eliminated.

• Proposed: A slope stabilization plan is required for any earth moving activity on natural slope cuts that exceeds 40 percent.

• Change: This measure was eliminated.

• Proposed: A slope stabilization plan is required for a cut slope that exceeds a 1 to 1 ratio of run to rise.

• Change: Applies only to slope cuts that exceed 15 feet in height.

• Proposed: A slope stabilization plan is required for a fill slope that exceeds a 1.5 to 1 ratio of run to rise.

• Change: Applies only to slopes that exceed 15 feet in height.

blog comments powered by Disqus
Read 526 times

Media

blog comments powered by Disqus

This Must Be the Place

  • This must be the place

    art theplaceThere’s no place like home. Amid my first few weeks living in Western North Carolina, there were times I got homesick. Though I have bounced around the country for many years now, I, too, have moments where I start to miss things familiar to me.

    Written on Wednesday, 23 July 2014 12:56 Read more...